Schemes of typical redirects and marking of works on the highway are an excerpt from the Rules on Road Signs and Signaling on Roads, the manner of marking of works and obstacles on the roads and signs that are given to the participants in traffic by an authorized person (“Official Gazette of the Federation B&H” No. 16/07):
TYPE 1
Pipelines and obstacles on the motorway, where the works of a wider volume (rehabilitation, reconstruction, construction) are carried out on a roadway and a traffic lane of a roadway, which last for a minimum of one day. In case of unfavorable geometric characteristics of the motorway, signs with a more restrictive regime of prohibitions and restrictions are used.
TYPE 2
Works and obstacles on the motorway, where the works of a wider volume (rehabilitation, reconstruction, construction) are carried out on a treadmill of one carriageway and last for a minimum of one day. In case of unfavorable geometrical characteristics of the motorway, signs with a more restrictive regime of restrictions and restrictions must be used.
TYPE 3
Works and obstacles on the motorway, with a wider range of works (rehabilitation, reconstruction, construction) carried out on one cart track, which last for a minimum of one day. In case of unfavorable geometrical characteristics of the motorway, signs with a more restrictive regime of restrictions and restrictions must be used.
TYPE 4
Works and obstacles on the motorway, with a wider range of works (rehabilitation, reconstruction, construction) carried out on one cart track, which last for a minimum of one day. In case of unfavorable geometrical characteristics of the motorway, signs with a more restrictive regime of restrictions and restrictions must be used.
TYPE 5
Works and obstacles on the motorway where works are carried out on the traffic conveyor belt (sampling, roadway measurements, punching of impact holes, cleaning, grass mowing, snow cleaning, fencing and sign cleaning, repairing the fence, restoring the edge and dividing line).
TYPE 6
Works and obstacles on the motorway where works are carried out on the traffic lane (sampling, roadway measurements, punching of impact holes, cleaning, grass mowing, snow cleaning, fencing and sign cleaning, repairing the fence, restoring the edge and dividing lines).
Works and obstacles on the motorway, where works are carried out on the overpass road (sampling, roadway measurements, punching of impact holes, cleaning, mowing of grass, snow cleaning, fencing and signing, fencing, repair of the fence, restoration of the edge and dividing lines).
Works and obstacles on the motorway, where a vehicle (a malfunction, an accident, etc.) was found on the traffic conveyor belt, which can not be removed for a period of less than 2 hours.
Works and obstacles on the motorway, where a vehicle (fault, accident, etc.) came to the overpassed traffic lane, which can not be removed for a period of less than 2 hours.