The contract for construction of the motorway on the Corridor Vc of the Poprikuša – Zenica north (Donja Gračanica) section, Vranduk – Ponirak subsection was signed on 15 May 2019. The contractor is the consortium of Azvirt L.L.C (Azerbaijan) and Hering d.d. Široki Brijeg (BiH).
Supervision of the execution of works is performed by the DRI consortium investment management d.o.o. (Slovenia) – DIVEL d.o.o. Sarajevo (BiH).
The value of the Contract for the construction of the Vranduk – Ponirak subsection is EUR 76,592,799.03 including VAT, and the funds are provided through the OPEC Fund for International Development (OFID).
The motorway route of Vranduk – Ponirak section is part of the Poprikuša – Zenica North (Donja Gračanica) section, which continues to the Nemila – Vranduk subsection in the north and the Ponirak – Vraca subsection in the south.
Retaining walls, two bridges, three viaducts and a tunnel will be built. At the length of 5.3 km long.
The predicted deadline for construction is 24 months.